Redwood Middle School – Napa Valley Unified School District
261
kW
Napa, CA
Project Details
Project Type:
Public Works
Redwood Middle School located in Napa, California services 6th through 8th grade students. Sunworks installed a 261 kW solar power system. This was a ground mount solar panel system installed to help decrease the power cost for the school.