NEM 3.0 NOTICE
Act Now! Lower Rates Expiring Soon in CA – Submit Application by April 14th!
Get Best Utility Rate
  • days
  • Hours
  • Minutes
  • Seconds

Redwood Middle School – Napa Valley Unified School District

261 kW
Napa, CA
Project Details
Project Type: Public Works
Redwood Middle School located in Napa, California services 6th through 8th grade students. Sunworks installed a 261 kW solar power system. This was a ground mount solar panel system installed to help decrease the power cost for the school.